Saturday 22 November 08 - 04:04
 

Port, Harbour & Marine Construction

Facelift for St George's

The 675m long St George's Bridge at Doncaster crosses the South Yorkshire Navigation Canal, River Don and the East Coast Main Line.

The Moog Bridge Inspection Platform spans the full width of St Georges Bridge.
The Moog Bridge Inspection Platform spans the full width of St Georges Bridge.

It is the last link in the UK's new Northern Relief Road. When Doncaster Metropolitan Borough Council was required to survey the bridge recently, it hired a Moog MBI 230 Bridge Inspection Platform from access specialists Facelift.

The Moog has a reach of 23m, which spans the full width of the bridge and provides access for four engineers at a time. This enabled a full survey of the structure to be carried out in only four nights.

West Sussex based Facelift GB Ltd hires a range of bridge inspection equipment which includes three different types of underbridge units from Moog and Simon Engineering as well as new Aichi Big Deck Platforms.

MJ Information No: 18928

Images for this article - click to enlarge

The Moog Bridge Inspection Platform spans the full width of St Georges Bridge.

Unless otherwise stated, all images copyright © Mercator Media 2008. This does not exclude the owner's assertion of copyright over the material.

Related products

For more information on products mentioned within this article visit

Facelift GB Ltd

MTU IRONMEN