Modified Elbe dredging plans out to consultation
11 Sep 2008
The modified documents will be available for public inspection in districts bordering both sides of the Elbe from 7 October to 6 November 2008. Objections and position statements in relation to the proposals can be submitted up to 20 November 2008.
The proposed deepening of the fairway of the Lower and Outer Elbe is aimed at allowing container ships with a maximum draught of up to 14.5m, unhindered access to and from the Port of Hamburg.
Planning permission was applied for as long ago as March of last year, and attracted a great deal of attention, not least because of the many objections raised.
Read the full story in the October issue of Maritime Journal.






