This is the first installation under the EU-WASP project and first commercial installation for the promising eConowind Ventifoil system. The 3,600 DWT general cargo vessel MV Ankie, made its first voyage with the two wings installed, sailing for Wagenborg from Delfzijl to Hamburg, onwards to Norway and then back to Rotterdam.
The modular Ventifoil units are in the form of wings with vents and an internal fan that use boundary layer suction for maximum effect. This installation features two, 10-metre wings that will generate significant force allowing the vessel to reduce motor power and thus save energy. In a second step, the units will be extended by a further six meters.
For eConowind BV, located in Groningen, the Netherlands, it is the first commercial installation of their Ventifoil system. The wind-assist system was developed over the past three years supported by an EU backed grant and this first voyage marks a significant milestone for the company in bringing their technology to a shipping market eager to deploy credible decarbonization solutions.
RINA carried out the design approval, foil production and construction supervision together with the commissioning protocol preparation. “This project fits perfectly with the strong focus RINA has on innovative technologies that contribute to an environmentally friendlier shipping industry” commented Pino Spadafora, EMEA Marine Commercial Director at RINA.
By Jake Frith