Wave Hub is creating the world’s largest test site for wave energy technology by building a grid connected socket on the seabed, 16 km off the coast of Cornwall UK, to which wave power devices can be connected and their performance evaluated.
The £42m project has been developed by the South West RDA and is a cornerstone of its strategy to develop a world class marine energy industry in South West England.
The cable, which weighs 1,300 tons and cost £7m to make, was spooled directly from the JDR Cable Systems’ factory in Hartlepool onto the cable laying ship MV Nordica at a rate of 400m per hour. The delicate operation ran 24 hours a day and took around five days to complete.
The Nordica has been chartered by CTC Marine Projects based in Darlington, County Durham, which has been appointed by the South West RDA to lay the cable and install Wave Hub on the seabed.
The RDA’s Wave Hub general manager Guy Lavender said, ‘This is a major milestone for Wave Hub and has been planned with military precision. We’ve already connected Wave Hub to the cable so it has been loaded first, followed by the cable itself. The whole operation needs to be carried out with great care so it will be a nail biting time for the whole team, but they are very experienced.
‘After that the Nordica will head for the north Cornwall coast to start the cable laying operation, and weather permitting we expect Wave Hub to be in the water in early August. This will be followed by a rock dumping operation to hold the hub and cable in place, ready for the first wave energy devices to be deployed in 2011.’
During its manufacture, Wave Hub’s cable has been coiled horizontally around two giant 30m diameter rotating ‘spools’ or carousels in JDR’s factory, each of which can carry 2,200 tons. The 33,000 volt cable has been manufactured in one continuous length and is made up of six copper cores, 48 fibre optic cables, two layers of steel wire armouring and an outer polymer sheath. It is 16cm in diameter.
The cable was spooled onto a 2,000 ton capacity carousel measuring 15m in diameter and 10m high and positioned on the rear deck of the Nordica.
Wave Hub is being funded with £12.5m from the South West RDA, £20m from the European Regional Development Fund Convergence Programme and £9.5m from the UK government.
An independent economic impact assessment has calculated that Wave Hub could create 1,800 jobs and inject £560m into the UK economy over 25 years. Almost 1,000 of these jobs and £332m could be generated in South West England.