AdvertisementPopup
Skip to content
AdvertisementLeaderboard 1
« Back to the main site
Sign in | Register
Get Set for Workboat 2050
As Stevns Icequeen is wheeled out of the construction shop its underwater shape and deep forward skeg are clearly visible. Shipyard News Stevns Icequeen – Another Canadian Tug for Denmark 1 October 2006
Brian Slade and Alan Dickinson, President and Vice-President of the SSA respectively, make their case at Seawork 2006. Shipyard News SSA Marine Services Group Initiative 1 July 2006
Having successfully completed trials, Dollaghan is placed on a low loader for transport to Coleraine. Shipyard News Water Witch Delivers Workboat to Rivers Agency of Northern Ireland 1 July 2006
Skomer is expected to operate from some 3,000 hours per year in an often hostile environment. Shipyard News Strength and Style in Milford Havens New Pilot Launch 1 June 2006
The offshore construction vessel Bibby Sapphire is seen in NSLs Birkenhead Yard dry dock for conversion to a dive support vessel. Shipyard News NSL Secures Cammell Laird Lease 1 April 2006
A twin-screw propulsion system includes fixed Kort nozzles and fish-tail rudders. Shipyard News Vikoma Take Delivery of Three Workboats for Pollution Control 1 February 2006
Tees Navigators excellent directional stability makes it a good choice for hydrographic survey duties. Shipyard News Wildcat Survey Boat Prowls Tees Ports 1 February 2006
Shipyard News WiWa Pumps Eurospray Expansion 1 November 2005
Metalock Engineering UKs expertise at in-situ deep hole drilling has enabled Deep Sea Seals to retrofit new sterntube seals to HMS Endurance. Shipyard News Sterntube Seal Change for Endurance 1 May 2005
The 96 wheel MPV transporter vehicle withdraws leaving the wing and its jig in place on the deck. Shipyard News Wings on the River Dee 1 August 2004
The underwater cofferdam is lowered into position. Shipyard News Voith Unit In-Water Replacement 1 March 2004
Shipyard News Vosper Thornycroft in Mediterranean Repair Agreement 1 April 2002
European Diplomats damaged Kawasaki bowthruster propeller, completely restored by Stephenson Marine Shipyard News Stephensons Rapid P&O Prop Repair 1 January 2002

Posts pagination

« Previous 1 … 4 5 6

Get Set for Workboat 2050

The event

  • Speakers
  • Sponsors
  • News

the main site

  • Latest news
  • the main site
© 2026 Get Set for Workboat 2050. All rights reserved. A Mercator Media publication