{"id":1823,"date":"2010-06-21T15:05:00","date_gmt":"2010-06-21T14:05:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2010\/06\/21\/wartime-respect-replaces-belfasts-rusting-masts\/"},"modified":"2026-08-26T22:24:47","modified_gmt":"2026-08-26T21:24:47","slug":"wartime-respect-replaces-belfasts-rusting-masts","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2010\/06\/21\/wartime-respect-replaces-belfasts-rusting-masts\/","title":{"rendered":"Wartime respect replaces Belfast\u2019s rusting masts"},"content":{"rendered":"<p>Now owned by the Imperial War Museum, <em>Belfast<\/em> has been on permanent display on the River Thames in central London since 1971. However, for several years its profile has been marred by unsightly scaffolding surrounding the mainmast. The cause is corrosion, which has affected both the cruiser\u2019s steel-lattice masts. The museum have been involved in trying to raise sufficient funds for repairs.<\/p>\n<p><em>Belfast<\/em>\u2019s role in helping to fight through vital wartime convoys to a beleaguered Soviet Union has now been recognised by the Russian government and the Russian marine industry with a commitment to replace the masts and restore the ship to its former glory, coinciding the 65th anniversary of VE Day and the end of World War Two in Europe.<\/p>\n<p>As part of Russia\u2019s marking the event, the President of the Russian Federation, Dmitry Medvedev, presented a signed commemorative diploma to the ship, and ordered the \u2018State Jubilee Medal for the 65th Anniversary of Victory in the Great Patriotic War 1941\u20131945\u2019 be awarded to <em>Belfast<\/em>\u2019s surviving crew members.<\/p>\n<p>But more significantly for <em>Belfast<\/em>, with President Medvedev\u2019s backing, the Russian shipping company Sovcomflot has mobilised several Russian shipyards to work on new steel-lattice masts for the ship. In support of the project, Sovcomflot also invited the City of London based classification society Lloyd\u2019s Register to help in assessing and designing the restoration work.<\/p>\n<p>St Petersburg based United Industrial Corporation (OPK) completed the prefabrication of the new set of masts in May, and they will be delivered later this year by Sovcomflot for fitting to <em>Belfast<\/em>. The operation will involve a floating crane being brought up the Thames to lift away the corroded masts, and then re-step their prefabricated replacements.<\/p>\n<p>David Moorhouse CBE, the chairman of Lloyd\u2019s Register, who was personally involved in agreeing the restoration work with the IWM, said it was a fitting way to show appreciation for the sacrifice of thousands of British sailors in both the merchant navy and Royal Navy who took part in the epic Arctic convoys, delivering desperately needed munitions, tanks and aircraft against determined German air and sea attack, not to mention sub-zero temperatures, ice and Arctic storms.<\/p>\n<p>Mr Moorhouse said, \u2018This project is about a very special bond, born out of hardship and danger and the mutual respect between the Russian and British sailors, many of whom gave their lives to keep the supply lines that were the Murmansk and Archangel convoys operational.\u2019<\/p>\n<p>Lloyd&#8217;s Register, itself celebrating its 250th anniversary this year, performed a structural survey of the lower portions of the masts and supporting decks so that the cut-off point could be determined. The structure was examined and a recommendation made that the main mast be replaced above the superstructure deck and the fore mast be replaced above the fan room deck head.<\/p>\n<p> To aid construction and enable quality control checks to ensure the accurate replication of the new masts, the Lloyd&#8217;s Register team redrew the original blue prints, which were over 50 years old and in imperial units, and converted the dimensions into metric.<\/p>\n<p> As well as service on the Arctic convoys, <em>Belfast<\/em> also took part in the sinking of the German battlecruiser <em>Scharnhorst<\/em> off the North Cape of Norway in December 1943 and was part of the bombardment force covering the D-Day landings. The vessel also saw service during the Korean War in 1950 to 1953.<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The veteran World War Two cruiser, HMS Belfast, is to have its rusting masts replaced courtesy of a former ally she fought to support, Russia.<\/p>\n","protected":false},"author":8,"featured_media":1824,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13],"tags":[],"sponsor":[],"class_list":["post-1823","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shipyard-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=1823"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1823\/revisions"}],"predecessor-version":[{"id":1825,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1823\/revisions\/1825"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/1824"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=1823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=1823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=1823"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=1823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}