{"id":1936,"date":"2010-11-25T11:04:00","date_gmt":"2010-11-25T11:04:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2010\/11\/25\/wind-turbine-manufacturers-plan-uk-locations\/"},"modified":"2026-08-26T22:25:46","modified_gmt":"2026-08-26T21:25:46","slug":"wind-turbine-manufacturers-plan-uk-locations","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2010\/11\/25\/wind-turbine-manufacturers-plan-uk-locations\/","title":{"rendered":"Wind turbine manufacturers plan UK locations"},"content":{"rendered":"<p>This news follows confirmation that the UK government is to provide \u00a360m worth of funding for the development of port infrastructure to meet the demands of the emerging offshore wind energy business.<\/p>\n<p>Separate funding will be made available to Scotland, Wales and Northern Ireland through devolved settlements.<\/p>\n<p>The funding for England will only go to assisted areas where applicant ports are supported by turbine manufacturers prepared to invest in manufacturing facilities. With the timescale of the funding plans, the involved company\u2019s plans and the timing of Round 3, with three huge zones designated for development in the UK North Sea, the funding is aimed at ports in the east and north east of England.<\/p>\n<p>Siemens claims to be the largest provider of wind turbines and offshore grid connections to the UK including a 50% equity holding in the SMart Wind consortium developing the Round 3 Hornsea project. The company reports it is on track to create around 700 direct and many more supply chain jobs in the UK by 2014 producing its new direct-drive 6MW offshore wind turbine in an investment worth \u00a380m. Siemens says it is well advanced in identifying suitable locations, having assessed over 100 ports in the UK and other North Sea countries.<\/p>\n<p>Up to 1,900 direct and supply chain jobs could be created by 2020 with GE\u2019s plans to invest \u00a3100m in manufacturing facilities in the UK, including design, application and service engineering resources. GE plans to develop its next generation offshore turbine using experience gained through its acquisition of ScanWind. The turbine incorporates advanced technology which eliminates the need for gearboxes and has a 4MW capacity. The new turbine is currently being demonstrated at Hundhammerfjellet in Norway where the first ScanWind direct drive unit was installed in 2005.<\/p>\n<p>Spanish company Gamesa is a major global wind turbine manufacturer with over 19,000MW of installed turbines in 20 countries worldwide and is forecasting that 1,000 direct and 800 indirect jobs will be created with their plans to invest up to \u20ac150m in the UK through to 2014. The company plans to base the global headquarters of its offshore division in London and open an R&amp;D centre for offshore technology, including the building of a turbine blade manufacturing facility. The associated port logistics and operations and maintenance services will be based at different ports in the UK. Gamesa is developing two new offshore turbine systems with capacities of 5MW and 6 to 7MW.<\/p>\n<p>Controlling the costs of offshore wind farms is currently seen as a priority and savings gained by sourcing components from UK manufacturers, avoiding the currency fluctuations associated with buying components priced in euros from other European suppliers, is just one aspect that has been identified for achieving significant savings.<\/p>\n<p><strong>By Peter Barker<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Three companies have now confirmed their intentions to press ahead with major investment in the offshore wind energy industry in the UK.<\/p>\n","protected":false},"author":8,"featured_media":1937,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-1936","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=1936"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1936\/revisions"}],"predecessor-version":[{"id":1938,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/1936\/revisions\/1938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/1937"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=1936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=1936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=1936"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=1936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}