{"id":2241,"date":"2012-09-03T07:30:00","date_gmt":"2012-09-03T06:30:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2012\/09\/03\/novel-jack-up-system-for-nordic-newbuild\/"},"modified":"2026-08-26T22:27:43","modified_gmt":"2026-08-26T21:27:43","slug":"novel-jack-up-system-for-nordic-newbuild","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2012\/09\/03\/novel-jack-up-system-for-nordic-newbuild\/","title":{"rendered":"Novel jack-up system for Nordic newbuild"},"content":{"rendered":"<p>The client is the Danish company DBB Jack-Up Services A\/S, based in Aarhus.<\/p>\n<p>The special vessel commissioned from Nordic Yards will be used for servicing offshore wind turbines and is able to work under the most challenging conditions. It is 80m long, 32m wide and has a novel jack-up system in that the vessel can be set up for its work at sea on four lifting legs and replace the heaviest wind turbine components at a height of up to 100m with the on-board crane. The vessel is suitable for maintenance works at a water depth of up to 45m.<\/p>\n<p>DBB Jack-Up Services A\/S has developed the concept of the special vessel based on the experiences with the self-elevating jack-up vessel M\/V Wind.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nordic Yards, manufacturer of innovative special ships and major maritime projects for the offshore wind and other industries, has signed a contract for the construction of a Wind Turbine Service Jack-Up Vessel (WTSJUV).<\/p>\n","protected":false},"author":8,"featured_media":2242,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2241"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2241\/revisions"}],"predecessor-version":[{"id":2243,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2241\/revisions\/2243"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2242"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2241"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}