{"id":2293,"date":"2012-11-19T14:51:00","date_gmt":"2012-11-19T14:51:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2012\/11\/19\/wind-farm-fleet-expansion-for-cwind\/"},"modified":"2012-11-19T14:51:00","modified_gmt":"2012-11-19T14:51:00","slug":"wind-farm-fleet-expansion-for-cwind","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2012\/11\/19\/wind-farm-fleet-expansion-for-cwind\/","title":{"rendered":"Wind farm fleet expansion for CWind"},"content":{"rendered":"<p>The company now has seven CTruk 20T multi-purpose catamarans operational. The two new vessels now working on crew transfer join a fleet already involved in rescue response, generator management and crew transfer tasks.<\/p>\n<p>Vessel capability is always a key consideration within this increasingly competitive offshore wind support market and CWind works closely with sister company CTruk Boats, which designs and builds a robust, seaworthy vessel. Its infused composites hull is much lighter than a comparable aluminium vessel, gives CWind\u2019s fleet a fuel consumption claimed to be almost half that of other operators.<\/p>\n<p>The 20T comfortably accommodates 12 passengers with air-con, TV\/DVD, WiFi, DTV, changing area, WC and hanging storage. With the flexible modular pod system, the vessels can be quickly reconfigured to adapt to perform varied tasks, including crew transfer, refuelling, and deployment as a rescue vessel, a survey vessel or a dive support vessel.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UK based offshore wind industry service company CWind has deployed a new wind farm support vessel to the London Array wind farm and another to Teesside.<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2293","post","type-post","status-publish","format-standard","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2293"}],"version-history":[{"count":0,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2293\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2293"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}