{"id":2310,"date":"2013-03-13T07:30:00","date_gmt":"2013-03-13T07:30:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2013\/03\/13\/windfarm-industry-examines-foundation-corrosion-guidelines\/"},"modified":"2026-08-26T22:28:26","modified_gmt":"2026-08-26T21:28:26","slug":"windfarm-industry-examines-foundation-corrosion-guidelines","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2013\/03\/13\/windfarm-industry-examines-foundation-corrosion-guidelines\/","title":{"rendered":"Windfarm industry examines foundation corrosion guidelines"},"content":{"rendered":"<p>Organising partners Vattenfall A\/S and DONG Energy A\/S along with technological partners FORCE Technology (Denmark and Norway) and Institut de la Corrosion (France) are now inviting windfarm operators and owners to join the project, to gather sufficient data to update corrosion control guidelines and obtain cost reductions through optimised corrosion control measures.<\/p>\n<p>The last ten years has seen rapid growth in the offshore wind industry with a natural desire to keep control of the length of time between planning and commissioning and moving into production phase. Allowing for the natural effects of corrosion on steel foundations typically involves corrosion allowances (in the specifications), coatings or cathodic protection, all of which are costly. It follows therefore that design guidelines should take into account actual prevailing conditions to balance costs and avoid either over-conservative or inadequate solutions being adopted. Recent discoveries have documented that foundation corrosion control, internally and externally, may be inadequate.<\/p>\n<p>There are similarities for offshore wind to the long established offshore oil and gas industry. Currently used standards and guidelines for corrosion control were initially based on that sector but the suitability of such an approach has now been questioned according to the project document. Insufficient knowledge of the degree of corrosion, has often led to owners basing their control measures on the worst case scenario resulting in undue project expense.<\/p>\n<p>On the other hand, it is stated that in some cases insufficiently corrosion protected windfarms do exist, resulting in increased OPEX through retrofits, inspections and studies. Against this background three main objectives have been identified: limiting cost of fabrication by reliable optimised and adapted design, limiting the expenses for repair and maintenance in the operational phase and thirdly, increasing the service life of foundations and immersed structures. In short, the design should be optimised for lifetime rather than continuous monitoring\/control and repair.<\/p>\n<p>Dependent on number of project partners, between three and six geographically different and representative sites will be covered. Three sets of monitoring equipment will be used, installed for one year at each of two sites resulting in six sets of data of two years. The project will run over three phases, firstly collection of experience and literature study, the second phase will involve collecting data including measuring site specific current demand (cathodic protection) in both open sea and site specific inside selected structures, measuring specific corrosion rates and cathodic protection performance on existing structures. Phase three involves project documentation and issuing of final guidelines. The project is expected to deliver phase three by the end of 2015.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A joint industry project has been set up to examine the subject of windfarm foundation corrosion and ensure design guidelines result in the most efficient and effective corrosion control solutions being adopted.<\/p>\n","protected":false},"author":8,"featured_media":2311,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2310","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2310"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2310\/revisions"}],"predecessor-version":[{"id":2312,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2310\/revisions\/2312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2311"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2310"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}