{"id":2386,"date":"2013-04-17T11:14:00","date_gmt":"2013-04-17T10:14:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2013\/04\/17\/western-link-cable-plans-explained-to-the-public\/"},"modified":"2026-08-26T22:29:14","modified_gmt":"2026-08-26T21:29:14","slug":"western-link-cable-plans-explained-to-the-public","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2013\/04\/17\/western-link-cable-plans-explained-to-the-public\/","title":{"rendered":"Western Link cable plans explained to the public"},"content":{"rendered":"<p>In the drive to reduce the cost of offshore wind, an area with potential to be a game changer beyond just how to improve the efficiency of our energy mix is the establishment of an offshore supergrid. Currently, radial systems connect each windfarm with the shore resulting in limitations of flexibility when balancing geographical supply and demand requirements. The UK&#8217;s landside grid network was designed for an era when manufacturing demand and subsequent generation provision was concentrated in the north of the country. The decline in heavy industry and manufacturing and increasing population and energy demands in the south means the supply and demand jigsaw is now often somewhat different.<\/p>\n<p>An offshore supergrid, particularly in the North Sea, would in effect create another grid &#8216;spine&#8217; linking the increasing number of windfarms with each other and the coast. Importantly it could also facilitate inter-connector links to the continent with significant potential for the whole of Europe. Interestingly such a network is one of the five pillars of the Third Industrial Revolution, a subject perhaps for another day.<\/p>\n<p>The GB\u00a31bn Western Link subsea cable project is a JV between National Grid and ScottishPower Transmissions aimed at helping bring renewable energy from Scotland to homes and businesses in Wales and England.<\/p>\n<p>In the UK, electricity is transmitted by alternating current. The Western Link cable will employ HVDC cable technology, requiring a convertor station at each end. The project is divided into five main sections: At the northern end of the link, a convertor station will be built adjacent to the existing Hunterston power station. Around 4km of underground DC cable will connect the convertor station with the site of the landfall of the undersea marine cable at Ardneil Bay.<\/p>\n<p>Approximately 385km of subsea cable will pass through international, Scottish, Northern Irish, Isle of Man, English and Welsh waters. As well as being the longest 2.2GW HVDC cable in the world, it will also be the first subsea link using a DC voltage level of 600kV. Two cables, paired in a bundle, will be deployed in shallow waters (less than 40m) with the cables laid separately 30m apart in deeper waters. They will be buried around 1.5m below the seabed, rock armour laid where it cannot be buried.<\/p>\n<p>The final two sections will consist of 33km of underground HVDC cable between the marine cable landing site at Leasowe on the Wirral peninsular and the southern convertor station on the site of the former coal-fired power station at Connah\u2019s Quay in Flintshire.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Further public engagement is underway with the plan to establish an electricity inter-connector between Scotland and England with implications beyond just the distribution of renewable energy.<\/p>\n","protected":false},"author":8,"featured_media":2387,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2386","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2386"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2386\/revisions"}],"predecessor-version":[{"id":2388,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2386\/revisions\/2388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2387"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2386"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}