{"id":2416,"date":"2013-06-03T07:30:00","date_gmt":"2013-06-03T06:30:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2013\/06\/03\/windfarm-work-begets-imca-jack-up-advice\/"},"modified":"2026-08-26T22:29:32","modified_gmt":"2026-08-26T21:29:32","slug":"windfarm-work-begets-imca-jack-up-advice","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2013\/06\/03\/windfarm-work-begets-imca-jack-up-advice\/","title":{"rendered":"Windfarm work begets IMCA jack-up advice"},"content":{"rendered":"<p>There is also an updated version of its information note \u2018The Inspection and Auditing of Manned and Unmanned Barges\u2019. With an increasing number of IMCA members involved with offshore renewable energy sector, both are aimed at ensuring and enhancing offshore safety.<\/p>\n<p>\u201cThe aim of IMCA M223 is to provide the owners and operators of dynamically positioned (DP) jack-up vessels with guidance to create procedures for going onto and leaving location, explains IMCA\u2019s technical director Jane Bugler. \u201cA DP system interfaces with the vessel\u2019s propulsion systems to hold the vessel in position against external forces (such as wind and waves) that are acting to move the vessel.<\/p>\n<p>\u201cFor DP vessels with jack-up capability, when a vessel moves into position on DP but intends to undertake the work on location as a jack-up vessel, there can potentially be excessive stresses induced into the legs during the transitional period from being on DP to \u2018leg touchdown\u2019 to soft pinning of the legs. The first leg contact with the seabed will restrict the vessel\u2019s motion which may indicate a position error to the DP system. This could the lead to an increase of thrust of the vessel\u2019s positioning propulsion systems and consequently may impart these excessive stresses on the legs.\u201d<\/p>\n<p>IMCA M223 has sections on Risk Analysis (vessel characteristics; environmental conditions and loading; site specific assessment integrity; and DP specification and performance); Background Material (that encompasses company procedures; vessel procedures; and information for each location); and covers Procedures for a DP Jack-up Vessel Going on and Leaving Location.<\/p>\n<p>Like all IMCA guidance it is free to download from the IMCA website for members and non-member alike. Printed copies can be purchased at \u00a35.00 for members and \u00a310.00 for non-members via the IMCA website at <a href=\"http:\/\/www.imca-int.com\/\">www.imca-int.com<\/a> and from <a href=\"mailto:publications@imca-int.com\">publications@imca-int.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The International Marine Contractors Association (IMCA) has published \u2018Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed\u201d (IMCA M223).<\/p>\n","protected":false},"author":8,"featured_media":2417,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2416","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2416"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2416\/revisions"}],"predecessor-version":[{"id":2418,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2416\/revisions\/2418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2417"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2416"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}