{"id":252,"date":"2019-03-07T12:27:00","date_gmt":"2019-03-07T12:27:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2019\/03\/07\/wec-demonstrator-build-contract\/"},"modified":"2026-08-26T22:12:28","modified_gmt":"2026-08-26T21:12:28","slug":"wec-demonstrator-build-contract","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2019\/03\/07\/wec-demonstrator-build-contract\/","title":{"rendered":"WEC demonstrator build contract"},"content":{"rendered":"<p>Simple in design, the WEC is tuned to maximise the power from incoming waves by extracting energy from the motion of its pendulum structure.<\/p>\n<p>AMOG is an award-winning team of consulting engineers, project managers and technicians, based in Australia and with offices in the UK, USA and Colombia.<\/p>\n<p>Stewart Graves, Managing Director, commented \u2018\u2019Mainstay is delighted to have been awarded the contract with AMOG against EU competition. This exciting project enhances our ever-increasing portfolio of Marine Energy fabrication projects and is great endorsement of our marine engineering capabilities and prospects for the future\u201d.<\/p>\n<p>It is anticipated that by the end of summer 2019, the one-third scale WEC will be deployed and tested at the University of Exeter\u2019s FabTest site in Falmouth, a \u2018nursery\u2019 test site for wave energy devices.<\/p>\n<p>By Jake Frith<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mainstay Marine Solutions, workboat builders and marine engineers in South West Wales, has been awarded a contract from AMOG Consulting Ltd for the construction of its Wave Energy Converter (WEC) technology demonstrator device.<\/p>\n","protected":false},"author":8,"featured_media":253,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-252","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=252"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/252\/revisions"}],"predecessor-version":[{"id":254,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/252\/revisions\/254"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/253"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=252"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}