{"id":2570,"date":"2014-04-03T07:30:00","date_gmt":"2014-04-03T06:30:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2014\/04\/03\/watching-the-wind-blow-off-portugal\/"},"modified":"2026-08-26T22:30:39","modified_gmt":"2026-08-26T21:30:39","slug":"watching-the-wind-blow-off-portugal","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2014\/04\/03\/watching-the-wind-blow-off-portugal\/","title":{"rendered":"Watching the wind blow off Portugal"},"content":{"rendered":"<p>EDP Inova\u00e7\u00e3o, S.A provides engineering development and research services for renewable power projects. The company was founded in 2006 and is based in Portugal. EDP Inova\u00e7\u00e3o, S.A operates as a subsidiary of EDP-Energias de Portugal, S.A.<\/p>\n<p>The Demowfloat project has received funding from the European Union\u2019s Seventh Programme for research, technological development and demonstration under grant agreement No 296050 and gathers 12 entities of five different countries who aim to test and monitor the performance of their floating wind turbine. The prototype, located 6km off the Portuguese shore, enables wind power to be harnessed at sea water at depths greater than 40m).<\/p>\n<p>The AXYS WindSentinel is scheduled for deployment in late summer as part of the ongoing validation program for the Demowfloat initiative.<\/p>\n<p>\u201cWe are extremely proud to have been chosen by the EDPi team to work on this groundbreaking initiative aimed at significantly reducing the cost of offshore wind, said Terry Tarle, president and CEO at AXYS. \u201cThis will be our first European deployment for the WindSentinel, which is representative of the unprecedented work being undertaken by the Demowfloat team.\u201d<\/p>\n<p>\u201cWe selected the AXYS WindSentinel plaftorm based on its track record of reliable performance in harsh marine environments similar to offshore Portugal where it will be deployed, and on its Vindicator III LiDAR technology which was designed to perform from a moving platform in an oceanic environment\u201d, said Pedro Valverde from EDPi.<\/p>\n<p>The WindSentinel is a wind resource assessment platform that uses the Vindicator III simultaneous pulse LiDAR to accurately measure wind speed, wind direction, and turbulence at turbine hub-height and across the blade span. Planet Ocean Ltd is AXYS\u2019 European distribution partner for WindSentinel.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AXYS Technologies Inc has had its WindSentinel selected for deployment off the coast of Portugal by EDP Inova\u00e7\u00e3o (EDPi) in support of its Demowfloat Initiative.<\/p>\n","protected":false},"author":8,"featured_media":2571,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2570","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2570"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2570\/revisions"}],"predecessor-version":[{"id":2572,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2570\/revisions\/2572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2571"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2570"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}