{"id":2914,"date":"2015-09-18T11:14:00","date_gmt":"2015-09-18T10:14:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2015\/09\/18\/state-of-the-art-cable-layer\/"},"modified":"2026-08-26T22:32:41","modified_gmt":"2026-08-26T21:32:41","slug":"state-of-the-art-cable-layer","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2015\/09\/18\/state-of-the-art-cable-layer\/","title":{"rendered":"State-of-the-art cable layer"},"content":{"rendered":"<p>The new ship will be custom-built to ABB specifications and measure approximately 140 by 30 metres. It will be constructed at Kleven shipyard in Norway.<\/p>\n<p>\u201cThis next-generation vessel incorporating state-of-the-art ABB technologies will be a key differentiator for our high-voltage cable business, enhancing flexibility and execution ability,\u201d said Claudio Facchin, president of ABB\u2019s Power Systems division. \u201cIt will also improve operational efficiency and customer focus, supporting profitable growth in line with our Next Level strategy.\u201d<\/p>\n<p>The new ship will deploy many of ABB\u2019s own leading marine technologies. The award-winning Onboard DC Grid and power distribution solution, for instance, will use a single DC circuit for ship propulsion to reduce power consumption. The vessel will set new standards for reliability and accuracy and will be equipped with roll-reduction tanks and the subsea operations will be executed and monitored by a remotely operated vehicle using cameras and sonar, avoiding the need for divers.<\/p>\n<p>The vessel will also feature a complete ABB Integrated Automation System and three Azipod propulsion units. Together with an energy storage system for marine applications it will cut fuel consumption by 27 percent and reduce maintenance compared to traditional AC systems. Sensors, monitoring hardware and software will enable data to be sent to shore via a satellite link, to allow the onshore technical support centers to work closely with the ship as part of ABB\u2019s Integrated Marine Operations solution. Advanced advisory software for motion monitoring, forecasting and decision support will also be on board.<\/p>\n<p>Thanks to DP3 dynamic positioning technology, the ship will be able to maintain its position with a high precision. The vessel is constructed in such a way that fire and flooding can be contained and will not compromise positioning and other essential systems.<\/p>\n<p>Cable links play a key role in the reliable and efficient transmission of large amounts of electricity, often over long distances. With experience dating back to 1883, ABB is a global leader in high-voltage cable systems with an installed base across applications such as integration of renewables, city center in-feeds, oil and gas platform power supplies, and subsea interconnections. ABB has commissioned more than 25 high-voltage direct current links and hundreds of high-voltage alternating current links around the world.<\/p>\n<p>Delivery is expected in 2017.<\/p>\n<p>By Jake Frith<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ABB, the Swiss power and automation technology group, has announced that it has ordered the world\u2019s most advanced cable-laying vessel to boost the capacity of its submarine cable operations while achieving greater efficiency and precision.<\/p>\n","protected":false},"author":8,"featured_media":2915,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13],"tags":[],"sponsor":[],"class_list":["post-2914","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shipyard-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2914"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2914\/revisions"}],"predecessor-version":[{"id":2916,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2914\/revisions\/2916"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2915"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2914"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}