{"id":2947,"date":"2015-11-20T16:44:00","date_gmt":"2015-11-20T16:44:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2015\/11\/20\/welsh-company-secures-eu-funds-for-novel-wave-energy-technology\/"},"modified":"2026-08-26T22:32:51","modified_gmt":"2026-08-26T21:32:51","slug":"welsh-company-secures-eu-funds-for-novel-wave-energy-technology","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2015\/11\/20\/welsh-company-secures-eu-funds-for-novel-wave-energy-technology\/","title":{"rendered":"Welsh company secures EU funds for novel wave energy technology"},"content":{"rendered":"<p>According to Gareth Stockman, Managing Director at MPS, the funds will allow a scaled prototype version of the technology to be developed and tested, helping to pave the way for a full-scale device that will be deployed in the Pembrokeshire Wave Energy Test Site off the Pembrokeshire coast and eventually launched in the commercial market.<\/p>\n<p>The WaveSub wave energy generation system draws upon patented technology developed by MPS, which Stockman says captures the high power density of waves through a unique power take-off system &#8211; and which is capable of withstanding storm force conditions.<\/p>\n<p>&#8220;The WaveSub is immensely efficient in power generation, construction and installation \u2013 creating the potential for a substantially lower energy cost than has been achieved by other renewable energy technologies,&#8221; says Stockman.<\/p>\n<p>&#8220;It directly addresses the fundamental challenges facing devices that try to exploit wave energy,&#8221; he adds.<\/p>\n<p><b>DEPTH ADJUSTABLE<br \/> <\/b>As Stockman explains, a key advantage of WaveSub is the highly efficient way it gathers energy &#8211; which he says is achieved via the deployment of an integrated subsurface &#8216;orbiting energy capture system&#8217; that is used to harnesses &#8216;the entire energy cycle of the wave.&#8217;<\/p>\n<p>In helping it to face up to the challenges posed by operating in often harsh environments, Stockman also reveals that the WaveSub is depth adjustable &#8211; a key feature that he says enables it to &#8216;descend beneath storms when necessary.&#8217; Stockman is also keen to stress that the novel &#8216;floating surface configuration&#8217; of the WaveSub ensures that it is &#8216;exceptionally easy to transport, install and maintain.&#8217;<\/p>\n<p>According to Stockman, the fact that the WaveSub is &#8216;cheap to manufacture due to its small size for power produced, simple shape, and low structural loads&#8217; will greatly help MPS in working towards its stated objective of achieving a low levelized cost of energy (LCOE).<\/p>\n<p>In carrying out the development and testing work, MPS will also benefit from the facilities available at the Wave Hub led Wave Demonstration Zone. The Zone &#8211; located some 13 km off the South Pembrokeshire coast across an area covering 90 sq km of seabed &#8211; has the potential to support wave energy arrays generating a capacity of up to 30MW for each project and is linked to a substation at Pembroke Power station via a 400kV transmission line. It is also situated conveniently near the deep water port facilities and support services available at the third busiest port complex in the UK.<\/p>\n<p>By Andrew Williams<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In late October, Swansea, UK-based wave energy company Marine Power Systems (MPS) announced that it had secured \u00a32 million of European Union (EU) funds for the development and testing of a scaled prototype of its innovative WaveSub device.<\/p>\n","protected":false},"author":8,"featured_media":2948,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-2947","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=2947"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2947\/revisions"}],"predecessor-version":[{"id":2949,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/2947\/revisions\/2949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/2948"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=2947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=2947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=2947"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=2947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}