{"id":3053,"date":"2016-05-03T17:58:00","date_gmt":"2016-05-03T16:58:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2016\/05\/03\/wind-powered-oil-recovery-gets-closer\/"},"modified":"2026-08-26T22:33:42","modified_gmt":"2026-08-26T21:33:42","slug":"wind-powered-oil-recovery-gets-closer","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2016\/05\/03\/wind-powered-oil-recovery-gets-closer\/","title":{"rendered":"Wind-powered oil recovery gets closer"},"content":{"rendered":"<p>The DNV GL-led WIN WIN1 Joint Industry Project (JIP) has now shown that for suitable oil fields, wind-powered water injection is technically feasible, capable of meeting performance targets, and offers a cost-competitive alternative to conventional water injection solutions.<\/p>\n<p>Technical and operational aspects as well as costs have been assessed. The JIP partners include ExxonMobil, ENI Norge, Nexen Petroleum UK Ltd., Statoil, VNG Norge, PG Flow Solutions and ORE Catapult.<\/p>\n<p>No major challenges have been identified through the JIP\u2019s study. Analyses of system performance examining site specific cases from JIP partners have shown that WIN WIN is able to meet the operator\u2019s key performance requirements such as injection volume targets, as well as reliability and minimized downtime.<\/p>\n<p>\u201cFor the first time we can now see renewable energy as a large scale source of power to offshore oil &amp; gas operations. By utilising the recent developments of floating offshore wind turbines this concept can offer a clean, reliable, and cost effective alternative for powering water injection in offshore locations. The WIN WIN project showcases that the oil and gas industry can become a creative force in solving the world\u2019s energy trilemma by driving development of reliable, clean and affordable technologies. This is a win for both the oil and gas and for the wind power industries,\u201d says Remi Eriksen, Group President and CEO of DNV GL.<\/p>\n<p>\u201cWe are encouraged by recent advances in wind technology, particularly for niche applications such as offshore oil and gas operations,\u201d says Sara Ortwein, President of ExxonMobil Upstream Research Company. \u201cSuch technological advances improve the economic feasibility for wind to contribute to the overall energy supply mix.\u201d<\/p>\n<p>\u201cSupplying clean power to oil &amp; gas installations was part of the original idea behind Statoil\u2019s Hywind concept\u201d, says Hanne Wigum, Head of Renewable Technology Development in Statoil. \u201cThe WIN WIN concept represents an alternative source of electricity and has the potential to open up new opportunities for field development.\u201d<\/p>\n<p>The costs for wind powered water injection have been compared with a conventional alternative where water is injected via a flow line from the host platform. While the WIN WIN technology has higher operational expenditures (OPEX) compared to a conventional alternative, the significantly lower capital expenditure (CAPEX) means that it compares favourably over the long term.<\/p>\n<p>By Jake Frith<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the past year, participants from both the renewables and oil and gas industries have worked together in the DNV GL-led WIN WIN JIP to develop the concept of using floating wind turbines to power a water injection system in detail, and assess its technical and commercial feasibility.<\/p>\n","protected":false},"author":8,"featured_media":3054,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"sponsor":[],"class_list":["post-3053","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-key-deals"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3053","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=3053"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3053\/revisions"}],"predecessor-version":[{"id":3055,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3053\/revisions\/3055"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/3054"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=3053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=3053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=3053"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=3053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}