{"id":3353,"date":"2017-08-15T09:28:00","date_gmt":"2017-08-15T08:28:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2017\/08\/15\/norwegian-built-to-a-scottish-design\/"},"modified":"2026-08-26T22:35:39","modified_gmt":"2026-08-26T21:35:39","slug":"norwegian-built-to-a-scottish-design","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2017\/08\/15\/norwegian-built-to-a-scottish-design\/","title":{"rendered":"Norwegian built to a Scottish design"},"content":{"rendered":"<p>The vessel is designed with a specific purpose in mind &#8211; to support the fish farm sector &#8211; and can perform multi-role tasks such as mooring work and towing. The <em>Gina Mary<\/em> boasts two cranes of 48tonne\/m at 18.5m outreach and 100tonne\/m at 22m outreach respectively. With a beam of 9.70m and depth of 3.50m, the vessel is capable of carrying four 20-foot containers on deck or a total of 115 tonnes of deck cargo.<\/p>\n<p>Built in just 5 months, the <em>Gina Mary<\/em> is the third vessel that Macduff has designed for Inverlussa, with a fourth vessel &#8211; already named <em>Keira Fiona<\/em> &#8211; due to be delivered in September of this year. The <em>Kiera Fiona<\/em> is a near sister ship to the <em>Gina Mary<\/em> but at 25.5m adds a bit of extra deck space for salmon treatment operations. The second vessel is already well under way in build.<\/p>\n<p>Both vessels feature a spacious accommodation area, with cabins for 6 crew below decks on the <em>Gina Mary<\/em> as well as an open-plan galley\/lounge area, dry locker, workshop, store and WC on the main deck.<\/p>\n<p>As one of the vessel\u2019s main duties is to carry peroxide tanks, she is also designed to meet the MCA hazardous cargo regulations.<\/p>\n<p>Moving below to the engine room, twin 600HP at 1800rpm Caterpillar C18 main engines are installed, driving fixed pitch propellers in nozzles through ZF W650 gearboxes. Auxilliary power is provided a Caterpillar C12 engine a Volvo D7 genset and Cat C4.4 genset.<\/p>\n<p><em>Gina Mary<\/em> is able to operate up to 150 miles from a safe haven and is already in service on the West Coast of Scotland. Her sister, the <em>Keira Fiona <\/em>has been designed to comply with Norwegian regulations as well, so has the option of operating in Norway as well as Scotland.<\/p>\n<p>Macduff Ship Design has had a busy year so far, with a series of new vessels being commissioned and built. Amongst these are a 90\u2019 fishing vessel for Canada as well as a 12.75m pilot boat and a 16m tug being built in Macduff for UK owners.<\/p>\n<p>By Jake Frith<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new 25m Aquaculture Support Vessel has recently been built by Havyard Shipyard in Norway to plans by Macduff Ship Design.<\/p>\n","protected":false},"author":8,"featured_media":3354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[13],"tags":[],"sponsor":[],"class_list":["post-3353","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shipyard-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=3353"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3353\/revisions"}],"predecessor-version":[{"id":3355,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3353\/revisions\/3355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/3354"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=3353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=3353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=3353"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=3353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}