{"id":3466,"date":"2018-01-18T15:45:00","date_gmt":"2018-01-18T15:45:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2018\/01\/18\/wave-energy-converter-deployed-at-emec-for-testing\/"},"modified":"2026-08-26T22:36:03","modified_gmt":"2026-08-26T21:36:03","slug":"wave-energy-converter-deployed-at-emec-for-testing","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2018\/01\/18\/wave-energy-converter-deployed-at-emec-for-testing\/","title":{"rendered":"Wave Energy converter deployed at EMEC for testing"},"content":{"rendered":"<p>CorPower\u2019s C3 point absorber was installed at the Scapa Flow scale test site in collaboration with local marine contractor Green Marine (UK) Ltd.<\/p>\n<p>\u201cThis demonstration programme shows how our resonant WEC technology can significantly reduce both CAPEX and OPEX of wave energy,\u201d said Patrik M\u00f6ller, CEO at CorPower Ocean.<\/p>\n<p>\u201cThe compact lightweight design enables effective handling using low cost vessels, reducing operational costs.\u201d<\/p>\n<p><strong>Device installation<\/strong><\/p>\n<p>The device was towed to the EMEC site and the surface operated install sequence was successfully performed from the Green Isle multicat vessel. The C3 WEC was connected to a floating microgrid unit provided by EMEC.<\/p>\n<p>This microgrid has been designed to allow the C3 device to behave as if it were grid connected by providing a stable voltage and frequency reference, simulating the impedance of a typical grid connection, absorbing power from the device under test and providing power to auxiliary systems.<\/p>\n<p>With the C3\u2019s performance having already proven in grid connected configuration during a dry testing campaign in Stockholm, this ocean deployment is looking to prove off-grid operations to address market segments such as islands, offshore installations or remote coastal locations around the world.<\/p>\n<p>CorPower\u2019s product development follows the structured five-stage verification process of Wave Energy Scotland (WES) and ETIP Ocean involving step-wise validation of survivability, performance, reliability and economics.<\/p>\n<p>The Stage 3 demonstration is funded by WES, the Swedish Energy Agency and InnoEnergy, with the testing at EMEC also supported by Interreg NWE FORESEA project.<\/p>\n<p>By Anne-Marie Causer<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A half-scale C3 wave energy converter has been installed at the European Marine Energy Centre (EMEC) in Orkney Scotland to help demonstrate its commercial viability.<\/p>\n","protected":false},"author":8,"featured_media":3467,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-3466","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=3466"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3466\/revisions"}],"predecessor-version":[{"id":3468,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/3466\/revisions\/3468"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/3467"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=3466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=3466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=3466"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=3466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}