{"id":644,"date":"2021-03-26T12:41:00","date_gmt":"2021-03-26T12:41:00","guid":{"rendered":"https:\/\/maritimejournal.nfdtesting.uk\/get-set-for-workboat-2050\/2021\/03\/26\/wave-energy-converter-ready-for-testing\/"},"modified":"2026-08-26T22:15:32","modified_gmt":"2026-08-26T21:15:32","slug":"wave-energy-converter-ready-for-testing","status":"publish","type":"post","link":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/2021\/03\/26\/wave-energy-converter-ready-for-testing\/","title":{"rendered":"Wave energy converter ready for testing"},"content":{"rendered":"<p>Danish company Wavepiston has installed the first full-scale modules, of its wave energy converter (WEC) at the test site of the Oceanic Platform of the Canary Islands (PLOCAN), said Ocean Energy Europe.<\/p>\n<p>Silvia Hildebrandt, PLOCAN, said: \u201cThe placement of Wavepiston\u2018s device in PLOCAN\u2019s test site represents a very important milestone for the MRE sector. Despite all the challenges of 2020, Wavepiston overcame the difficulties and successfully completed the installation of two full-scale modules of their prototype. Here at PLOCAN, we are proud to support the development of initiatives to accelerate the energy transition and foster a blue economy.\u201d<\/p>\n<p><strong>Chain effect<\/strong><\/p>\n<p>Wavepiston\u2019s wave energy prototype was assembled in the Port of Las Palmas and towed to PLOCAN\u2019s test area. The system comprises a chain of wave energy collectors stretched between two anchored buoys. The plates of the collectors move when waves roll along the system, pumping pressurised sea water into a pipe leading to a turbine or a reverse osmosis system, in order to obtain energy or desalinated water. The current set-up is a pre-installation where the company are testing two energy collectors. The first full string with 24 energy collectors is planned to be installed in the autumn.<\/p>\n<p>The main characteristics of this technology are its flexible, robust and light structure, its modular design and its low impact on the marine environment.<\/p>\n<p>In November 2020, Wavepiston launched a crowdfunding campaign which has raised more than EU2.3m for the final phase of the development and full-scale demonstration of their technology.<\/p>\n<p>By Rebecca Jeffrey<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Testing will begin shortly on a new wave energy converter (WEC) that allows the conversion of wave motion into electricity and desalinated water.<\/p>\n","protected":false},"author":8,"featured_media":645,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"sponsor":[],"class_list":["post-644","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/comments?post=644"}],"version-history":[{"count":1,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/644\/revisions"}],"predecessor-version":[{"id":646,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/posts\/644\/revisions\/646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media\/645"}],"wp:attachment":[{"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/media?parent=644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/categories?post=644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/tags?post=644"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/www.maritimejournal.com\/get-set-for-workboat-2050\/wp-json\/wp\/v2\/sponsor?post=644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}