Dredging spoils transform into new terminal

180,000 cubic metres of dredged material are currently being reused as filling material in the construction of the Port of Gothenburgs next major investment.

00_57111_gothen

180,000 cubic metres of dredged material are currently being reused as filling material in the construction of the Port of Gothenburgs next major investment.