Breakwater Beats the Weather at Holy Loch

Intermarine Ltd has just completed a race against time to design, supply and install a floating breakwater and moorings in the Holy Loch on the west coast of Scotland. The breakwater for client Seavision Ltd creates a large area of protected water for the continuing development of moorings over the next three to five years.

The Holy Loch breakwater was installed within 24 hours of the components arriving from Finland.

Intermarine Ltd has just completed a race against time to design, supply and install a floating breakwater and moorings in the Holy Loch on the west coast of Scotland. The breakwater for client Seavision Ltd creates a large area of protected water for the continuing development of moorings over the next three to five years.