Mostyn Makes Most of Offshore Winds

The installation and staged commissioning of the UKs newest wind farm off the coast of Wales has established the Port of Mostyn as a specialist base of operations for a significant new industry which looks set for continuing growth. The finishing touches will be applied to the 60MW North Hoyle offshore wind farm this month when the purpose-built installation vessel Mayflower Resolution arrives soon after its delivery voyage from China to place the power nacelles and blades on the final three turbines.

The Port of Mostyn is fully equipped to support the offshore windpower industry.

The installation and staged commissioning of the UKs newest wind farm off the coast of Wales has established the Port of Mostyn as a specialist base of operations for a significant new industry which looks set for continuing growth. The finishing touches will be applied to the 60MW North Hoyle offshore wind farm this month when the purpose-built installation vessel Mayflower Resolution arrives soon after its delivery voyage from China to place the power nacelles and blades on the final three turbines.