Temporary Repairs Deliver Damaged Bulker

A 26,000 ton bulk carrier had been involved in a serious grounding and Hydrex was called out to do an inspection off the coast of Cyprus. The owners wanted a clear picture of the extent of the damage and temporary repairs to enable the vessel to arrive safely in an Antwerp dry dock.

A diver inspects the damage.

A 26,000 ton bulk carrier had been involved in a serious grounding and Hydrex was called out to do an inspection off the coast of Cyprus. The owners wanted a clear picture of the extent of the damage and temporary repairs to enable the vessel to arrive safely in an Antwerp dry dock.