Heavy turbine lift

The Port of Leith recently welcomed the arrival of eight onshore wind turbines as part of the 16MW Howpark Wind Farm to be located in the Scottish Borders.

64 turbine parts including blades and tower sections were taken off the vessel

The Port of Leith recently welcomed the arrival of eight onshore wind turbines as part of the 16MW Howpark Wind Farm to be located in the Scottish Borders.