Build underway for methanol hybrid CSOVs

The steel-cutting ceremony for the first of two next-generation methanol hybrid construction service operating vessels has been held on 18 January 2023 at Tersan Shipyard in Turkey.

The-Acta-CSOV-was-the-first-design-contract-to-implement-the-TWIN-X-STERN

The steel-cutting ceremony for the first of two next-generation methanol hybrid construction service operating vessels has been held on 18 January 2023 at Tersan Shipyard in Turkey.