Forth Ports spends £50m after ‘game changer’ contract

The UK’s third largest port operator, Forth Ports, has put £50 million (€60.6 million) into its Port of Leith to build the port infrastructure essential for installing the 1.1GW Inch cape offshore wind farm.

Location of Inch Cape offshore wind farm

The UK’s third largest port operator, Forth Ports, has put £50 million (€60.6 million) into its Port of Leith to build the port infrastructure essential for installing the 1.1GW Inch cape offshore wind farm.