Underwater Thruster Removal Speeds Repair
To avoid the drydocking of a 126m LPG tanker, Hydrex was recently hired to remove the vessel’ s thruster and bring it to the manufacturer for repairs while it was berthed at Moerdijk in the Netherlands.
To avoid the drydocking of a 126m LPG tanker, Hydrex was recently hired to remove the vessel’ s thruster and bring it to the manufacturer for repairs while it was berthed at Moerdijk in the Netherlands.