Crimea bridge progress

A major step in the construction of the Crimea Bridge has been achieved with the installation of the railway arch section of the bridge that allows clearance for shipping underneath.

The length of each span is close to 227 metres

A major step in the construction of the Crimea Bridge has been achieved with the installation of the railway arch section of the bridge that allows clearance for shipping underneath.