Largest monopile installed by jack-up in Europe

Iberdrola

The first foundation of a €4.7 billion offshore wind farm in the UK has been installed, standing 84 metres tall, more than 10 metres in diameter and 1,800 tonnes in weight.

Seaway7 is installing all of the East Anglia Three monopiles and transition pieces with Seaway Ventus, which has been fitted with a custom-built mission equipment spread that was designed, fabricated and installed in under two years.

This is premium content

Already a member? SIGN IN now

V2-MJ

Register for a FREE one-month trial to continue this article

It only takes a minute to sign up for a free account, and you’ll get to enjoy:

  • Weekly newsletters providing valuable news and information on the commercial marine sector
  • Access to the Maritime Journal Industry Database
  • Website access (3 standard news articles per month)

Get access and more free content sign up today

Does your organisation require more access? Upgrade to a subscription and enjoy unlimited news and additional features.