Mediterranean wind turbine pilot
Saitec is planning to install a pre-commercial wind turbine park on the Costa Brava
Medfloat Pilot Parc will involve the creation of a test infrastructure in the Levantino-Balearic Demarcation for the testing, demonstration and validation of SATH technology. It will also demonstrate the technical, environmental and social feasibility of future developments of floating offshore wind energy in the Mediterranean.
The park, located in open sea in Girona, specifically in an area located more 15 km from Cap de Creus on the Costa Brava, will consist of five units and a total potential of 50MW in the Mediterranean Sea in 2025.
Feasibility studies
At the same time, it aims to become a pioneering project to investigate the possibilities of shared use with other activities, especially with fishing and aquaculture, as well as the promotion of employment and boost the supply chain of offshore wind energy in Catalonia. In addition, the wind turbines will potentially provide power for 50,000 homes.
Medfloat Pilot Parc has started with the presentation of the initial project document for assessment by the competent environmental body, which will answer with information on the scope that the environmental impact study should have. However, Saitec is already carrying out drafting work on the Environmental Impact Study.
The selected installation area has been provisionally defined as priority use for offshore wind power in the maritime spatial planning plans of Spanish Government. At the same time, it also meets the right wind and depth conditions required in order to launch this project.
Medfloat Pilot Parc is an initiative aligned with the climate neutrality objectives and one step forward in consolidating SATH technology after the development of the pioneering 2 MW DemoSATH project, which is currently under construction in the port of Bilbao.
The objective of this pilot project, carried out in collaboration with RWE, is to test the technology and progress in the industrialised manufacturing process for this solution.
DemoSATH will be installed in the BiMEP test area (Biscay, Spain), where tests will be carried out for two years, providing useful information for the environmental evaluation of MedFloat. DemoSATH will be the first floating offshore wind turbine connected to the Spanish grid and capable to provide power to 2,000 homes.