Marine Civils

The Concordat covers from the PLA’s seaward limits in the Outer Thames Estuary to its landward limits at Teddington Lock MARINE CIVILS

Thames Concordat

The tunnel will be constructed from 79 individual elements MARINE CIVILS

German Fehmarnbelt link consultation concluded

A rendering of the 5000mt tub mounted crane for 'Pioneering Spirit' MARINE CIVILS

20,000 tonnes worth of orders for Huisman

Ramboll will develop options for the replacement or upgrade of existing wharf and jetties MARINE CIVILS

Ramboll to help berth ‘Sir David’

The height allowance of the bridge for vessels to pass under was increased by 2.4m MARINE CIVILS

Mega Jack European debut

The new wall will significantly reduce the risk of flooding to large parts of Morecambe MARINE CIVILS

Morecambe flood protection project

Wind turbine installation vessel (WTIV), 'MPI Discovery' MARINE CIVILS

‘MPI Discovery’ back on Rampion

This remotely controlled robot was fitted with a disconnectable power control module MARINE CIVILS

Pier hydrodemolition

BorWin gamma HVDC platform (Image: Petrofac) MARINE CIVILS

DNV GL to provide installation engineering

MARINE CIVILS

Tunnel contracts signed

Sponsored