Grand block ceremony for cable installation vessel

The grand blocks for a state-of-the-art cable layer have begun assembly at a Polish yard to meet its expected delivery in 2021.

The design is based on the combined experience of Nexans, Skipsteknisk, Ulstein Verft and MAATS Tech

The grand blocks for a state-of-the-art cable layer have begun assembly at a Polish yard to meet its expected delivery in 2021.