Vard converts PSV into a specialised cable-laying vessel
Vard has successfully delivered a specialised cable-laying vessel (CLV) to its new owner after a complex vessel conversion from a Platform Supply Vessel (PSV).
The transformation of the IT Infinity was completed for IT International Telecom Marine SRL (IT) to meet the growing demand for subsea telecommunications infrastructure.
Built originally in 2008 as the “Volstad Princess”, the vessel underwent an extensive retrofit process at Vard Brattvaag, Norway and was delivered to IT in 2024.
“We are very proud that IT chose Vard as their partner for this significant conversion,” said Wilhelm Eggesbø, senior vice president of Vard Services.
“This project showcases Vard’s expertise in vessel retrofit and reinforces our ability to provide tailored solutions for specialized marine applications.”
Key upgrades
The conversion process included extensive structural modifications, such as the addition of accommodations for 32 crew members and approximately 550 tonnes of steel.
Key upgrades included the installation of advanced cable-laying equipment, including a 60-tonne A-frame, a 20-tonne Linear Cable Engine, and a cable plough system.
Additionally, the vessel’s electrical systems were enhanced by Vard Electro, ensuring efficient operations.
The final conversion also incorporated a fully operational DP2 Class positioning system, optimising the vessel’s capabilities for cable laying in challenging subsea environments.
Steve Arsenault, vice president of sales & marketing at IT, praised the collaboration: “Vard’s expertise was instrumental in ensuring the vessel was fully equipped to serve the subsea telecommunications market, a crucial industry in need of such specialised ships.”
The project marks a key milestone in IT’s efforts to expand its fleet for the growing demand for marine power solutions.