Diesel electric dredger order
Belgium’s Jan De Nul Group has ordered three 3,500 m3 Trailing Suction Hopper Dredgers to be built at Keppel Nantong, and these vessels which will operate in environmentally sensitive areas, will not be LNG powered.
Belgium’s Jan De Nul Group has ordered three 3,500 m3 Trailing Suction Hopper Dredgers to be built at Keppel Nantong, and these vessels which will operate in environmentally sensitive areas, will not be LNG powered.