AdvertisementPopup
Skip to content
AdvertisementLeaderboard 1
« Back to the main site
Sign in | Register
Get Set for Workboat 2050
Viking2 Accessories & Equipment Statoil contract for Viking 5 May 2014
MacGregor's three-axis motion compensated crane employs new technology that compensates for vessel movements in the horizontal plane (pitch and roll) in addition to heave compensation in the vertical plane Accessories & Equipment Windfarm installation crane wins award 27 March 2014
A ShipArrestor trial with a drifting LNG tanker Accessories & Equipment Norway commits to the ShipArrestor 20 February 2014
The NORSOK regulations apply to davits and lifting appliances used on offshore installations Accessories & Equipment NORSOK standards raise safety bar 18 December 2013
An Offshore Wind training course underway at Maersk Training Accessories & Equipment Wind powers apprentices recruitment drive 28 October 2013
Assembly of the new pontoon was undertaken in a safe area away from aircraft traffic then towed into its final location alongside the airport’s main runway Accessories & Equipment Non-slip solutions for airport pontoon 11 October 2013
The SSAVs were engineered by Eide Marine Service, which is a neighbouring company to Noreq Accessories & Equipment Norwegian lifesaving package for SSAVs 12 August 2013
Accessories & Equipment WMA offers escape chute training course 7 August 2013
Caption:  Left to right: David Brook – Director RNLI , Charlie Mill, MD Ocean Safety. Back row:L to r: Shaun Botha, Buyer, RNLI, Allen Stevens,Senior Engineer, RNLI, Mandy Boughton, Business Development Manager, Ocean Safety Accessories & Equipment Ocean Safety to supply complete RNLI fleet 23 June 2013
The X2’s MOB related features include a brilliant 700 lumens searchlight Accessories & Equipment Norway’s NSRA opts for powerful searchlight 29 May 2013
Para Anchors are already in use on many of Australia’s fishing boats, workboats and commercial vessels Accessories & Equipment Ocean Safety appoints Australia distributor 8 May 2013
The satellite industry is working hard to combat the issue of interference Accessories & Equipment Noisy errors cost satellites clarity 26 February 2013
The DaccR presents impact and acceleration data graphically, illustrating peak impact values and GPS tracking over time Accessories & Equipment Next generation boat impact recorder launched 19 November 2012
Para Anchor and Para Drogue with robust stowage and deployment bags Accessories & Equipment Ocean Safety acquires Para Anchor 15 November 2012
The course covers how to measure WBV and RS on all types of craft, including analysis methods and their appropriate use. Photo by Murray Martin Accessories & Equipment WBV motion analysis course explodes myths 9 November 2012
Damen Shipyard is working with the Dutch lifeboat organisation, the KNRM, and design team De Vries Lentsch Design to develop this new concept in lifeboat design Accessories & Equipment Wave piercing future for small boat design 27 August 2012
By reducing the weight and size of the splice, the A3 splice enables single person rope handling Accessories & Equipment Nice splice lines up a Seatrade award 9 August 2012
NoreqActa is to supply 108 Wind Turbine Platform Cranes (WTPCs) for the West of Duddon Sands Accessories & Equipment Wind platform cranes evolve 30 July 2012
Almost 330 tons of rescue package on deck, including a generator set from Aggreko Northern Europe to provide extra electric current for the equipment Accessories & Equipment Submarine rescue package ready for action 30 July 2012
The new feature combines sea chart and weather chart in one display. Accessories & Equipment Weather chart overlay for Synapsis ECDIS 21 May 2012

Posts pagination

« Previous 1 2 3 4 5 6 … 8 Next »

Get Set for Workboat 2050

The event

  • Speakers
  • Sponsors
  • News

the main site

  • Latest news
  • the main site
© 2026 Get Set for Workboat 2050. All rights reserved. A Mercator Media publication