Innovative load testing solution for harbour wall
Dover’s development plan for the Wellington Dock marina in the UK included the design of a mobile boat hoist with a maximum future lift capacity of 75 tonnes.
Dover’s development plan for the Wellington Dock marina in the UK included the design of a mobile boat hoist with a maximum future lift capacity of 75 tonnes.