First Caissons Floated Out for Durban Quay Wall Project

Contractor Interbeton has sunk the first caissons that will form the basis of a new 1,200m long quay wall at the Port of Durban in South Africa, a project that Interbeton is carrying out in a Joint Venture (JV) with the local construction firms Grinaker-LTA and BCW.

More than 50 caissons will be required to build the new quay wall at Durban.

Contractor Interbeton has sunk the first caissons that will form the basis of a new 1,200m long quay wall at the Port of Durban in South Africa, a project that Interbeton is carrying out in a Joint Venture (JV) with the local construction firms Grinaker-LTA and BCW.