Marine Civils

Suzan Daniel bridge MARINE CIVILS

Brussels bridge nears completion

MARINE CIVILS

Danish base for new wind farms

rock in Southsea MARINE CIVILS

Rock delivery escalates sea defence works

Walsh has already shifted more than 600,000 tonnes of material MARINE CIVILS

‘Super sewer’ spoil shifting

Capable 'Haven SeaChallenger' has deck dimensions of 50 x 24m and a leg length of 55m MARINE CIVILS

Jack-up investment will bring company step change

The route planned is west of the Bosphorus Strait, and includes the area from the Kucukcekmece Lake to the Durusu region MARINE CIVILS

Kanal Istanbul to go ahead

The wave attenuator was designed not only to welcome visitors for a unique on-water experience but also as a wave protection for the harbour MARINE CIVILS

Floating wave attenuator

The first investment of €8 million went towards the preparation of the site MARINE CIVILS

Maritime hub for Malta

Howth Harbour near Dublin is undergoing a transformation MARINE CIVILS

Howth harbour developments

EMODnet Pan-European overview maps of shoreline migration (red = landward; yellow = stable; green = seaward) MARINE CIVILS

European shoreline changes mapped over decades

Red7Marine’s 400t jack-up barge, the 'Haven Seaseven' MARINE CIVILS

Challenging winter project completed at Seaton Port

The tunnel will allow ships to bypass the exposed and dangerous waters of the Stadthavet Sea MARINE CIVILS

World’s first ship tunnel gets closer to reality

The three navigation structures were installed from a 250 tonne jack up barge MARINE CIVILS

Challenging navaids upgrade job recognised

MARINE CIVILS

Greenlink Interconnector marine licence approved

Framo pumping system technology will secure and safely anchor the wind turbine platforms MARINE CIVILS

Suction anchor pumping system

Caused by storm and tidal surges, coastal inundation poses a significant risk for seaside communities around the world (Photo: UKHO) MARINE CIVILS

Innovation challenge takes on coastal inundation

The new building work will be on either side of the harbour, which is approximately 2.5kms long MARINE CIVILS

Expansion at Amalia harbour

Kværner, which merged with Aker Solutions last year, is in charge of the engineering, procurement, and construction of the floating concrete substructures for Hywind Tampen MARINE CIVILS

Concrete hulls for floating wind

Sponsored