News

The 5GW threshold was crossed when Gwynt y Mor wind farm, off the coast of North Wales, was officially inaugurated OFFSHORE RENEWABLES

5 gigawatt milestone

The Thames Garden Bridge will be clad in anti-microbial MARINE CIVILS

Thames Garden Bridge project

At 30% smaller than other similar products, the lightweight rescueME MOB1 measures just 134mm by 38mm SEAWORK NEWS

Ocean Signal lights up Seawork

HYDROGRAPHIC SURVEY

The Hydrographic Society UK elects new chairman

HYDROGRAPHIC SURVEY

Survey for world’s longest HVDC route

HYDROGRAPHIC SURVEY

Fugro positioning for DeepOcean Group vessels

HYDROGRAPHIC SURVEY

Suitcase surveying

Design concept for Blyth Workcats’ new 14-metre survey catamaran which is due to be delivered to ABP Humber next March HYDROGRAPHIC SURVEY

ABP Humber orders new catamaran

'Seastick’ features traditional forward dive controls and stern rudders and incorporates two variable pitch thrusters KEY DEALS

Planet Ocean introduces ‘Seastick’ to UK

Aerial view of Grangemouth Docks DREDGING & FLOOD DEFENCE

Grangemouth dredging

Sponsored