Bollard pull buoy is worlds largest
The largest offshore structure in the Mediterranean was recently positioned 12 nautical miles off the Ravenna coast in 25m of water in order to test bollard pull. The zone is a special area equipped for testing the power and efficiency of tugboats.
The largest offshore structure in the Mediterranean was recently positioned 12 nautical miles off the Ravenna coast in 25m of water in order to test bollard pull. The zone is a special area equipped for testing the power and efficiency of tugboats.